|
The arched doorways opened into the roof of the Germination Floor. A conveyor belt would’ve originally
been installed here and it would’ve brought the barley from the central Barley Store in malting house #5,
along all the conveyor bridges between the various blocks, to the Steep.
|
|
Looking north where a conveyor would've originally delivered barley from the conveyor bridge
to the steep. © Simon Cornwell 2009
|
|
|
|